INTEGRATION RELAY > INSPECTION

for Preparation Click here



1. INSPECT INTEGRATION NO.1 RELAY


A200987E03
  1. Check the resistance (ECD relay).

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      A1 - B1
      Battery voltage not applied between B8 - E1 terminals
      10 kΩ or higher
      A1 - B5
      A1 - B5
      A1 - E5
      A1 - E6
      A1 - E7
      A1 - F6
      A1 - F7
      A1 - F9
      A1 - F10
      A1 - F11
      A1 - B1
      Battery voltage applied between B8 - E1 terminals
      Below 1 Ω
      A1 - B5
      A1 - B5
      A1 - E5
      A1 - E6
      A1 - E7
      A1 - F6
      A1 - F7
      A1 - F9
      A1 - F10
      A1 - F11

      If the result is not as specified, replace the vacuum switching valve assembly.

  1. Check the resistance (IG2 relay).

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      A1 - B7
      Battery voltage not applied between D12 - B4 terminals
      10 kΩ or higher
      A1 - D1
      A1 - B7
      Battery voltage applied between D12 - B4 terminals
      Below 1 Ω
      A1 - D1

      If the result is not as specified, replace the vacuum switching valve assembly.